CFLHD Tools
Construction Schedules
-
CFLHD Construction Schedule Guidelines
- Guidelines to use while developing CPM schedules. (Rev 04-06-07)
-
Production Rate Spreadsheet
- Approximate range of production rates typical for CFLHD work. (Rev 09-09-09)
Materials
-
Application Rates and Unit Weights Used for Estimating Purposes
- List of estimated values to use for calculating quantities (Rev 02-19-09)
Earthwork
-
Grading Summary Spreadsheet
-CFLHD spreadsheet used to generate the Grading Summary, Mass Haul Diagram, and miscellaneous summaries. (Rev 03-07)
-
Earthwork Representation Drawings
- CFLHD CADD drawings included in the plans to provide a visual representation of earthwork quantities. (Rev 04-08)
-
Earthwork Representation Guidelines
- CFLHD document providing a guide to the standard procedure for calculating and representing earthwork volumes in the plans. (Rev 10-21-04)
Staking Information
-
Quality Control Review Guide for Staking Data
- Guidelines to review and check staking data (Rev 05-07)
-
Guide to Designing and Staking Culvert
- Guidelines for culvert design, plotting, and staking (Rev 01-09-96)
Regional Areas
-
Regional Areas of the Forest Service
- (Rev 11-15-2006)
-
Regional Areas of the National Park Service
- (Rev 11-15-2006)
-
Regional Areas of the National Wildlife Refuge
- (Rev 11-15-2006)