We are updating the look of the site, this will take some time. Please bear with us.

Central Federal Lands Highway Division Central Federal Lands Highway Division
About CFLHD Projects Procurement Design Resources Technology Development Materials Central Federal Lands Highway Division
  Home > Projects
spacer image
Projects Home In Development Under Construction Long Range Transportation Plans Wall Inventory

Wall Inventory Program (WIP) Overview

The National Park Service Retaining Wall Inventory Program (WIP) was developed to quantify and characterize wall assets associated with Park roadways in terms of their location, geometry, construction attributes, condition, failure consequence, cultural concerns, apparent design criteria and cost of structure maintenance, repair or replacement.

The WIP program was commissioned at the request of the NPS Washington Administrative Services Organization (WASO), Park Facility Management Division. The program is supported by both NPS WASO personnel and staff from the Federal Lands Highway Division (FLHD) of the Federal Highway Administration (FHWA). Both organizations are equally responsible for the development and management of the WIP program; the FLHD has taken the lead for delivery of field inventories, while the NPS is primarily responsible for integration of WIP data within the FMSS asset management system.

Similarly to the ongoing National Park Service Road Inventory Program (RIP), it is the intent of the WIP inventory to periodically reassess retaining wall resources at program Parks to further develop asset management strategies for Park roadways. Although highly focused on the asset management needs and processes unique to the NPS, this inventory and assessment approach should find application within a broader national audience as federal, state and local agencies tackle retaining wall asset issues tied to transportation infrastructure.

The WIP reports currently available represent inventory work conducted at 32 national park facilities.

Acadia National Park Hot Springs National Monument
Bryce Canyon National Park Lassen Volcanic National Park
Baltimore-Washington Memorial Parkway Mesa Verde National Park
Big South Fork River & Recreation Area Morristown National Historical Park
Blue Ridge Parkway Mount Rainier National Park
Capulin Volcano National Monument Natchez Trace Parkway
Colorado National Monument New River Gorge National River
Crater Lake National Park Olympic National Park
Delaware Water Gap Rocky Mountain National Park
Fire Island National Recreation Area Sequoia/Kings Canyon National Park
Gateway National Recreation Area Shenandoah National Park
George Washington Memorial Parkway Steamtown National Historic Site
Glacier National Park Wind Cave National Park
Great Smoky Mountains National Park Yellowstone National Park
Golden Gate National Recreation Area Yosemite National Park
Haleakala National Park Zion National Park

Wall Inventory Reports

Total Number of Walls by Park (17k - PDF)
Estimated Repair Costs And Recommended Action by Region Park (32k - PDF)
Estimated Repair Costs by Recommended Action - All Parks (14k - PDF)

Additional WIP reports are being developed and will be placed on this site as soon as they are completed.

 

Top of Page

Home | About CFLHD | Projects | Procurement | Design Resources | Technology Development | Contact Information

USDOT | FHWA | FLHP | EFLHD | CFLHD | WFLHD

Please send your questions or comments to CFL.Webmaster@fhwa.dot.gov