Division 100 - GENERAL REQUIREMENTS
|
| S101-03 |
TERMS, FORMAT, AND DEFINITIONS |
ENGLISH
(03|13|09)
|
METRIC
(03|13|09)
|
| S102-03 |
BID, AWARD, AND EXECUTION OF CONTRACT |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S104-03 |
CONTROL OF WORK |
ENGLISH
(02|11|09)
|
METRIC
(02|11|09)
|
| S105-03 |
CONTROL OF MATERIAL |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S106-03 |
ACCEPTANCE OF WORK |
ENGLISH
(01|07|08)
|
METRIC
(01|07|08)
|
| S107-03 |
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
|
|
| S107-03AZ |
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
ENGLISH
(04|14|09) |
METRIC
(04|14|09) |
| S107-03CA |
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
ENGLISH
(04|14|09) |
METRIC
(04|14|09) |
| S107-03GEN |
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
ENGLISH
(04|14|09) |
METRIC
(04|14|09) |
| S107-03NV |
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
ENGLISH
(04|14|09) |
METRIC
(04|14|09) |
| S107-03NoNPDES |
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
ENGLISH
(04|14|09) |
METRIC
(04|14|09) |
| S107-03NoNPDES |
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
ENGLISH
() |
METRIC
(04|14|09) |
| S107-03TX |
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
ENGLISH
(04|14|09) |
METRIC
(04|14|09) |
| S107-03UT |
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
ENGLISH
(04|14|09) |
METRIC
(04|14|09) |
| S108-03 |
PROSECUTION AND PROGRESS |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S109-03 |
MEASUREMENT AND PAYMENT |
ENGLISH
(04|14|09)
|
METRIC
(04|14|09)
|
|
Division 150 - PROJECT REQUIREMENTS
|
| S152-03 |
CONSTRUCTION SURVEY AND STAKING |
ENGLISH
(11|18|09)
|
METRIC
(11|18|09)
|
| S153-03 |
CONTRACTOR QUALITY CONTROL |
ENGLISH
(01|02|08)
|
METRIC
(01|02|08)
|
| S154-03 |
CONTRACTOR SAMPLING AND TESTING |
ENGLISH
(12|02|09)
|
METRIC
(12|02|09)
|
| S155-03 |
SCHEDULES FOR CONSTRUCTION CONTRACTS |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S156-03 |
PUBLIC TRAFFIC |
ENGLISH
(11|20|09)
|
METRIC
(11|20|09)
|
| S157-03 |
SOIL EROSION CONTROL |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
|
Division 200 - EARTHWORK
|
| S203-03 |
REMOVAL OF STRUCTURES AND OBSTRUCTIONS |
ENGLISH
(07|19|07)
|
METRIC
(07|19|07)
|
| S204-03 |
EXCAVATION AND EMBANKMENT |
ENGLISH
(03|13|09)
|
METRIC
(03|13|09)
|
| S205-03 |
ROCK BLASTING |
ENGLISH
(10|15|09)
|
METRIC
(10|15|09)
|
| S207-03 |
EARTHWORK GEOTEXTILES |
ENGLISH
(02|14|07)
|
METRIC
(02|14|07)
|
| S209-03 |
STRUCTURE EXCAVATION AND BACKFILL |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S211-03 |
ROADWAY OBLITERATION |
ENGLISH
(03|13|09)
|
METRIC
(03|13|09)
|
| S213-03 |
SUBGRADE STABILIZATION |
|
METRIC
(03|29|06)
|
|
Division 250 - SLOPE REINFORCEMENT AND RETAINING WALLS
|
| S251-03 |
RIPRAP |
ENGLISH
(03|13|09)
|
METRIC
(03|13|09)
|
| S252-03 |
SPECIAL ROCK EMBANKMENT AND ROCK BUTTRESS |
ENGLISH
(10|15|09)
|
METRIC
(10|15|09)
|
| S253-03 |
GABIONS AND REVET MATTRESSES |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S255-03 |
MECHANICALLY STABILIZED EARTH WALLS |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S257-03 |
ALTERNATE RETAINING WALLS |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
|
Division 300 - AGGREGATE COURSES
|
| S301-03 |
UNTREATED AGGREGATE COURSES |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S302-03 |
TREATED AGGREGATE COURSES |
|
METRIC
(03|29|06)
|
| S303-03 |
ROAD RECONDITIONING |
ENGLISH
(03|29|07)
|
METRIC
(03|29|07)
|
| S304-03 |
AGGREGATE STABILIZATION |
ENGLISH
(02|14|07)
|
METRIC
(02|14|07)
|
| S308-03 |
MINOR CRUSHED AGGREGATE |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
|
Division 400 - ASPHALT PAVEMENTS AND SURFACE TREATMENTS
|
| S401-03 |
SUPERPAVE HOT ASPHALT CONCRETEPAVEMENT |
ENGLISH
(05|01|08)
|
METRIC
(05|01|08)
|
| S402-03 |
HOT ASPHALT CONCRETE PAVEMENT BY HVEEM OR MARSHALL MIX DESIGN METHOD |
ENGLISH
(05|01|08)
|
METRIC
(05|01|08)
|
| S403-03 |
HOT ASPHALT CONCRETE PAVEMENT |
ENGLISH
(01|29|10)
|
METRIC
(01|29|10)
|
| S404-03 |
MINOR HOT ASPHALT CONCRETE |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S405-03 |
OPEN-GRADED ASPHALT FRICTION COURSE |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S408-03 |
COLD RECYCLED ASPHALT BASE COURSE |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S409-03 |
ASPHALT SURFACE TREATMENT |
ENGLISH
(12|02|09)
|
METRIC
(12|02|09)
|
| S410-03 |
SLURRY SEAL |
ENGLISH
(06|12|06)
|
METRIC
(06|12|06)
|
| S411-03 |
ASPHALT PRIME COAT |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S412-03 |
ASPHALT TACK COAT |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S416-03 |
CONTINOUOUS COLD RECYCLED ASPHALT BASE COURSE |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
|
Division 500 - RIGID PAVEMENTS
|
| S501-03 |
RIGID PAVEMENT |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
|
Division 550 - BRIDGE CONSTRUCTION
|
| S551-03 |
DRIVEN PILES |
ENGLISH
(09|22|06)
|
METRIC
(06|13|07)
|
| S552-03 |
STRUCTURAL CONCRETE |
ENGLISH
(02|02|10)
|
METRIC
(02|02|10)
|
| S553-03 |
PRESTRESSED CONCRETE |
ENGLISH
(11|20|09)
|
METRIC
(11|20|09)
|
| S554-03 |
REINFORCING STEEL |
ENGLISH
(11|20|09)
|
METRIC
(11|20|09)
|
| S555-03 |
STEEL STRUCTURES |
ENGLISH
(09|22|06)
|
METRIC
(09|22|06)
|
| S562-03 |
TEMPORARY WORKS |
ENGLISH
(06|13|07)
|
METRIC
(06|13|07)
|
| S565-03 |
DRILLED SHAFTS |
ENGLISH
(03|13|09)
|
METRIC
(03|13|09)
|
| S566-03 |
SHOTCRETE |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S569-03 |
MICROPILES |
ENGLISH
(02|11|09)
|
METRIC
(02|11|09)
|
|
Division 600 - INCIDENTAL CONSTRUCTION
|
| S601-03 |
MINOR CONCRETE STRUCTURES |
ENGLISH
(10|15|09)
|
METRIC
(10|15|09)
|
| S602-03 |
CULVERTS AND DRAINS |
ENGLISH
(10|21|09)
|
METRIC
(10|21|09)
|
| S609-03 |
CURB AND GUTTER |
ENGLISH
(11|16|09)
|
METRIC
(11|16|09)
|
| S614-03 |
LEAN CONCRETE BACKFILL |
ENGLISH
(10|15|09)
|
METRIC
(10|15|09)
|
| S617-03 |
GUARDRAIL |
ENGLISH
(10|15|09)
|
METRIC
(10|15|09)
|
| S619-03 |
FENCES, GATES, AND CATTLE GUARDS |
ENGLISH
(10|15|09)
|
METRIC
(10|15|09)
|
| S623-03 |
GENERAL LABOR |
ENGLISH
(09|22|06)
|
METRIC
(09|22|06)
|
| S625-03 |
TURF ESTABLISHMENT |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S633-03 |
PERMANENT TRAFFIC CONTROL |
ENGLISH
(11|16|09)
|
METRIC
(11|16|09)
|
| S634-03 |
PERMANENT PAVEMENT MARKINGS |
ENGLISH
(11|16|09)
|
METRIC
(11|16|09)
|
| S635-03 |
TEMPORARY TRAFFIC CONTROL |
ENGLISH
(11|16|09)
|
METRIC
(11|16|09)
|
|
Division 700 - MATERIAL
|
| S701-03 |
CEMENT |
ENGLISH
(10|15|09)
|
METRIC
(10|15|09)
|
| S702-03 |
ASPHALT MATERIAL |
ENGLISH
(12|02|09)
|
METRIC
(12|02|09)
|
| S703-03 |
AGGREGATE |
ENGLISH
(12|01|09)
|
METRIC
(12|01|09)
|
| S704-03 |
SOIL |
ENGLISH
(02|04|09)
|
METRIC
(02|04|09)
|
| S705-03 |
ROCK |
ENGLISH
(03|13|09)
|
METRIC
(03|13|09)
|
| S706-03 |
CONCRETE AND PLASTIC PIPE |
ENGLISH
(11|20|09)
|
METRIC
(11|20|09)
|
| S709-03 |
REINFORCING STEEL AND WIRE ROPE |
ENGLISH
(09|22|06)
|
METRIC
(06|13|07)
|
| S710-03 |
FENCE AND GUARDRAIL |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S712-03 |
JOINT MATERIAL |
ENGLISH
(11|20|09)
|
METRIC
(11|20|09)
|
| S714-03 |
GEOTEXTILE AND GEOCOMPOSITE DRAIN MATERIAL |
ENGLISH
(02|11|09)
|
METRIC
(02|11|09)
|
| S717-03 |
STRUCTURAL METAL |
ENGLISH
(10|16|09)
|
METRIC
(10|16|09)
|
| S718-03 |
TRAFFIC SIGNING AND MARKING MATERIAL |
ENGLISH
(11|16|09)
|
METRIC
(11|16|09)
|
| S720-03 |
STRUCTURAL WALL AND STABILIZED EMBANKMENT MATERIAL |
ENGLISH
(03|29|06)
|
METRIC
(03|29|06)
|
| S725-03 |
MISCELLANEOUS MATERIAL |
ENGLISH
(01|11|10)
|
METRIC
(01|11|10)
|
 |